Wentworth Point has this to connect to Rhodes:
http://www.baylinkshuttle.com.au/
(NSW's only all-door loading bus service, shhhh!)
http://www.baylinkshuttle.com.au/
(NSW's only all-door loading bus service, shhhh!)
- Fleet Lists
- Administrator
- Posts: 23803
- Joined: Sat Mar 06, 2004 12:49 pm
- Location: The Shire
Re: Parramatta light rail
But that is not really part of the public transport system.
Living in the Shire.
Re: Parramatta light rail
Not TfNSW's system, but it's open to anybody, so it's public transport.Fleet Lists wrote: ↑Tue Dec 28, 2021 1:15 pm But that is not really part of the public transport system.
- Campbelltown busboy
- Posts: 2129
- Joined: Sun Aug 11, 2013 1:23 pm
- Location: Ruse/Campbelltown City NSW
Re: Parramatta light rail
If that happens then the Royal Agricultural Society would have to buy the old Showground witch is now the Moore Park entertainment quarter back from the current owners for the Easter show as the Olympic Park precinct includes the Sydney Showground
- boronia
- Posts: 21577
- Joined: Sat Mar 06, 2004 6:18 am
- Favourite Vehicle: Ahrens Fox; GMC PD4107
- Location: Sydney NSW
Re: Parramatta light rail
The sports facilities are still there, and a number of major events are regularly held in the various facilities there during the year.
Not just housing, but potential for more commercial use as well.
Preserving fire service history
@ The Museum of Fire.
@ The Museum of Fire.
- Fleet Lists
- Administrator
- Posts: 23803
- Joined: Sat Mar 06, 2004 12:49 pm
- Location: The Shire
Re: Parramatta light rail
A matter of interpretation.covo95 wrote: ↑Tue Dec 28, 2021 1:59 pm Stage 2 scrapped
https://www.smh.com.au/national/nsw/tak ... 59kg4.html
"Not comitted" does not mean cancel. I think the minster kept the door open to commit to it at a later date.
Living in the Shire.
Re: Parramatta light rail
Not a surprise.
The numbers were always going to be difficult to stack up once it was determined that building housing on the Camelia site wasn't going to happen.
The numbers were always going to be difficult to stack up once it was determined that building housing on the Camelia site wasn't going to happen.
-
- Posts: 1138
- Joined: Sun Dec 27, 2015 10:08 pm
Re: Parramatta light rail
It’s pretty disappointing but the area will still be getting Metro West in a similar time frame to when PLR Stage 2 was originally forecast to be deliveredcovo95 wrote: ↑Tue Dec 28, 2021 1:59 pm Stage 2 scrapped
https://www.smh.com.au/national/nsw/tak ... 59kg4.html
Re: Parramatta light rail
Reading the SMH paper this morning, it is stated by David Elliot as the reason given as 'we are too busy fixing the ferries, and the other trams, to think about a line extension that wouldn't be ready until at least 2025'. To think that they don't have enough brains to build perway and rollingstock at the same time. They sure have enough marketers though.Jurassic_Joke wrote: ↑Tue Dec 28, 2021 4:33 pmIt’s pretty disappointing but the area will still be getting Metro West in a similar time frame to when PLR Stage 2 was originally forecast to be deliveredcovo95 wrote: ↑Tue Dec 28, 2021 1:59 pm Stage 2 scrapped
https://www.smh.com.au/national/nsw/tak ... 59kg4.html
- boronia
- Posts: 21577
- Joined: Sat Mar 06, 2004 6:18 am
- Favourite Vehicle: Ahrens Fox; GMC PD4107
- Location: Sydney NSW
Re: Parramatta light rail
What perway and rolling stock, at the same time as what?
Preserving fire service history
@ The Museum of Fire.
@ The Museum of Fire.
- Campbelltown busboy
- Posts: 2129
- Joined: Sun Aug 11, 2013 1:23 pm
- Location: Ruse/Campbelltown City NSW
Re: Parramatta light rail
Wasn't the Olympic Park stage of this light rail line planed to end at Strathfield at stage
- Fleet Lists
- Administrator
- Posts: 23803
- Joined: Sat Mar 06, 2004 12:49 pm
- Location: The Shire
Re: Parramatta light rail
It was under discussion in the early stages but like all of stage 2 it was never a firm plan.
Living in the Shire.
Re: Parramatta light rail
You would think he was on the tools himself. Reality is that a degree of belt tightening is inevitable over the next few years, and that some of the lesser infrastructure projects will fall by the wayside.ACM wrote: ↑Reading the SMH paper this morning, it is stated by David Elliot as the reason given as 'we are too busy fixing the ferries, and the other trams, to think about a line extension that wouldn't be ready until at least 2025'. To think that they don't have enough brains to build perway and rollingstock at the same time. They sure have enough marketers though.
- Fleet Lists
- Administrator
- Posts: 23803
- Joined: Sat Mar 06, 2004 12:49 pm
- Location: The Shire
Re: Parramatta light rail
I think the grandiose Constance plans are a thing of the past. Also keep in mind that the elections are now just over 12 months away so the first priority is to get existing problems fixed if they want to get reelected.
Living in the Shire.
- Swift
- Posts: 13273
- Joined: Sat Mar 06, 2004 1:23 pm
- Favourite Vehicle: Porshe 911 Carerra
- Location: Ettalong- the world capital of 0405s.
Re: Parramatta light rail
I'm glad distractions have cropped up and put out on hold. Gives hope they won't end up proceeding with that daft plan and maybe build one to Macquarie instead.
NSW, the state that embraces mediocrity.
-
- Posts: 1490
- Joined: Fri Nov 25, 2011 10:10 pm
Re: Parramatta light rail
Which should have been the first priority with the route via Eastwood as recommended in Parramatta City Council's original feasibility study, but completely ignored when TfNSW took over the planning. It wasn't even on the shortlist of options for some strange reason. Instead we've ended up with a line cut short at Carlingford with little to no prospect of it being extended to Epping, let alone Macquarie Park.
Re: Parramatta light rail
I'd settle with punching the light rail through to Carlingford proper.
And then maybe a distinct Olympic Park line that runs
Rhodes-Wentworth Park-(Newington)-Olympic Park
And if you determine you never want to reuse the Olympic Park rail alignment, onto Lidcombe
Though personally I'd prefer a metro running Bankstown- Lidcombe- Olympic Park over that track, put the plans seem to prefer a Parramatta hub for future metros.
And then maybe a distinct Olympic Park line that runs
Rhodes-Wentworth Park-(Newington)-Olympic Park
And if you determine you never want to reuse the Olympic Park rail alignment, onto Lidcombe
Though personally I'd prefer a metro running Bankstown- Lidcombe- Olympic Park over that track, put the plans seem to prefer a Parramatta hub for future metros.
Last edited by moa999 on Thu Dec 30, 2021 8:24 pm, edited 2 times in total.
-
- Posts: 1490
- Joined: Fri Nov 25, 2011 10:10 pm
Re: Parramatta light rail
Parramatta City Council's recommended first stages for a light rail network shown thus.
https://i.imgur.com/MAlWAEM.jpg
https://i.imgur.com/MAlWAEM.jpg
Re: Parramatta light rail
Transtopic, what's the date of that map? Any context please?
-
- Posts: 1490
- Joined: Fri Nov 25, 2011 10:10 pm
Re: Parramatta light rail
The map is taken from the Western Sydney Light Rail Feasibility Study Part 2 undertaken on behalf of Parramatta City Council in 2013. It disappeared off the council's website shortly after TfNSW took over the planning. Strangely, it didn't even make the shortlist of options.
-
- Posts: 1490
- Joined: Fri Nov 25, 2011 10:10 pm
Re: Parramatta light rail
Further to above, I've managed to copy the link to the document.
https://documentcloud.adobe.com/link/tr ... 50edf26b16
https://documentcloud.adobe.com/link/tr ... 50edf26b16
- Transport Buff
- Posts: 161
- Joined: Sat Sep 16, 2017 1:46 pm
- Favourite Vehicle: R9 Volvo Volgren artic
- Location: Eastern Suburbs, Sydney, NSW
- Contact:
Re: Parramatta light rail
Interesting video about the construction of the new Parramatta Light Rail (Stage 1):
https://www.parramattalightrail.nsw.gov ... light-rail
Will be interesting to see the final result when its all completed in 2023 (if all goes to plan).
https://www.parramattalightrail.nsw.gov ... light-rail
Will be interesting to see the final result when its all completed in 2023 (if all goes to plan).
Love Volvo B12BLEA, Mercedes O405NH, Scania K310UB, Custom Denning Element
Excited for:
-Sydney Metro C&SW, West, WSydAirport
-NIF
-PLR
-WestConnex
YouTube: www.youtube.com/@TransportBuff
Excited for:
-Sydney Metro C&SW, West, WSydAirport
-NIF
-PLR
-WestConnex
YouTube: www.youtube.com/@TransportBuff
- gilberations
- Posts: 870
- Joined: Thu Aug 11, 2011 12:36 am
Re: Parramatta light rail
Based on my current understanding, the Camellia to Carlingford section looks like it’s ready for rolling stock testing. Is this correct? Or are the wires not up yet? It almost looks like they could open it in 2 stages if they wanted to, Camellia to Carlingford then Camelia to Westmead.
From memory as a guard, most of the passengers who used the carlingford line were traveling between Rydalmere and Carlingford, so it wouldn’t be the worst idea…
From memory as a guard, most of the passengers who used the carlingford line were traveling between Rydalmere and Carlingford, so it wouldn’t be the worst idea…