Timetable project of mine

Perth / Western Australia Transport Discussion

Moderators: perthbus, Mr OC Benz

Merc1107
Posts: 2243
Joined: Sat Jul 07, 2012 6:38 pm
Favourite Vehicle: MAN 18.310, MB O405NH, L94
Location: A Coastal City

Re: Timetable project of mine

Post by Merc1107 »

Enviro 500 wrote: Tue Nov 29, 2022 2:54 pm Both were subsequently downgraded in later years. 920 faced stiff competition from 530 for the Fremantle-Spearwood portion.
While beyond the general topic of this thread, I would argue that was more because the two routes are (at times) not coordinated particularly well (the 549 connects with the train at Freo, the 530 does not), and this is further exasperated by the tendency of 530 inbound to Fremantle to suffer substantial delays trying to turn onto Beeliar Dr, and again when crossing Stock Rd. The end result being the 530 and 549 would leapfrog one-another up Rockingham Rd.

While the reduction in service frequency was understandable (given the length of the 920/549 relative to its usage), rather than just wait for a 549 knowing it would arrive soon, passengers now have to figure out which of the four Rockingham Rd services will arrive first, and if it will even stay on Rockingham Rd! That's to say nothing of the erratic service frequencies towards Cockburn (particularly during the afternoon peak).
shinjiman
Posts: 370
Joined: Wed Apr 11, 2007 5:22 pm

Re: Timetable project of mine

Post by shinjiman »

busdriver12 wrote: Sun Nov 27, 2022 7:17 pm Should be the last update for 2022. Contract area information files also updated - links for both files in my sig.
Just seen the contractor info, isn't that the route 375 still operated by Path (Morley contract)? Only the route 376 had been transferred to Swan (Joondalup contract). Route 449 should operated by Path (Morley) instead of Swan. Route 281 should be visible in timetable list now and operated by Path (Kalamunda).

Also routes 14, 308, 340 and 522 are no longer runs as well.
Routes 886/887 and 889 are now routes 360/361 and 362 respectively.
Enviro 500
Posts: 1098
Joined: Tue Feb 04, 2020 2:42 pm
Favourite Vehicle: Scania N113CRB
Location: WA 6000
Contact:

Re: Timetable project of mine

Post by Enviro 500 »

What buses on 376 now? Any Malaga buses moved to Wangara?
shinjiman
Posts: 370
Joined: Wed Apr 11, 2007 5:22 pm

Re: Timetable project of mine

Post by shinjiman »

Enviro 500 wrote: Fri Dec 02, 2022 12:20 pm What buses on 376 now? Any Malaga buses moved to Wangara?
Haven't seen any of the bus moving around, the route 376 is now run by Wangara depot.
Enviro 500
Posts: 1098
Joined: Tue Feb 04, 2020 2:42 pm
Favourite Vehicle: Scania N113CRB
Location: WA 6000
Contact:

Re: Timetable project of mine

Post by Enviro 500 »

shinjiman wrote: Fri Dec 02, 2022 3:00 pm
Enviro 500 wrote: Fri Dec 02, 2022 12:20 pm What buses on 376 now? Any Malaga buses moved to Wangara?
Haven't seen any of the bus moving around, the route 376 is now run by Wangara depot.
If it is that easy, Routes 72 and 75 are better off under Canning package with 280 going the other way. Especially 75, as it can be directly deployed from CVDEP.
User avatar
busdriver12
Posts: 232
Joined: Mon Mar 02, 2015 2:07 pm
Favourite Vehicle: One that doesn't break down!
Location: Byford

Re: Timetable project of mine

Post by busdriver12 »

shinjiman wrote: Fri Dec 02, 2022 2:31 am
Just seen the contractor info, isn't that the route 375 still operated by Path (Morley contract)? Only the route 376 had been transferred to Swan (Joondalup contract). Route 449 should operated by Path (Morley) instead of Swan. Route 281 should be visible in timetable list now and operated by Path (Kalamunda).

Also routes 14, 308, 340 and 522 are no longer runs as well.
Routes 886/887 and 889 are now routes 360/361 and 362 respectively.
Thanks for the heads up - I usually pride myself for attention to detail. Looks like a couple slipped through to the keeper. :oops: They'll be amended as spare time allows...
Phil

All views expressed are strictly my own and do not represent my employer or anyone else.
User avatar
busdriver12
Posts: 232
Joined: Mon Mar 02, 2015 2:07 pm
Favourite Vehicle: One that doesn't break down!
Location: Byford

Re: Timetable project of mine

Post by busdriver12 »

Just completed the updates for June 12. There's been a couple of major updates so far this year (29 Jan and 12 Jun) and of course we have the upcoming Armadale line shut down and all that entails. The contract area file has also been updated to reflect the additions and deletions from the most recent changes.

As usual, links in the sig :)
Phil

All views expressed are strictly my own and do not represent my employer or anyone else.
shinjiman
Posts: 370
Joined: Wed Apr 11, 2007 5:22 pm

Timetable project of mine

Post by shinjiman »

Just seen the updated one, but still, the route 449 is in Morley contract and operated by Path Transit since day one that was introduced.

And the route 281 is still missed for this update.
User avatar
busdriver12
Posts: 232
Joined: Mon Mar 02, 2015 2:07 pm
Favourite Vehicle: One that doesn't break down!
Location: Byford

Re: Timetable project of mine

Post by busdriver12 »

shinjiman wrote: Sun Jun 18, 2023 4:53 pm Just seen the updated one, but still, the route 449 is in Morley contract and operated by Path Transit since day one that was introduced.
All sorted now - tnx
Phil

All views expressed are strictly my own and do not represent my employer or anyone else.
Enviro 500
Posts: 1098
Joined: Tue Feb 04, 2020 2:42 pm
Favourite Vehicle: Scania N113CRB
Location: WA 6000
Contact:

Re: Timetable project of mine

Post by Enviro 500 »

Throw in 577 and 585 in Rockingham package.
User avatar
busdriver12
Posts: 232
Joined: Mon Mar 02, 2015 2:07 pm
Favourite Vehicle: One that doesn't break down!
Location: Byford

Re: Timetable project of mine

Post by busdriver12 »

Due to unauthorised editing of the file this morning, I have removed it.
Phil

All views expressed are strictly my own and do not represent my employer or anyone else.
Post Reply

Return to “Discussion - Perth / WA”