https://translink.com.au/yerongastationclosure
6 month closure of Yeronga station due of the construction from late April, Rail bus shuttle will be number 109 between Moorooka and Boggo busway stations.
Yeronga Station Closure.
Moderator: PRT 065
- superbossgc
- Posts: 2167
- Joined: Thu Apr 20, 2006 2:11 pm
Yeronga Station Closure.
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
- superbossgc
- Posts: 2167
- Joined: Thu Apr 20, 2006 2:11 pm
Re: Yeronga Station Closure.
Closures commencing 19th April 2021 for 6 months.
https://crossriverrail.qld.gov.au/const ... 5iC13Huxr4
109 stationlink service is to start run between Moorooka and Boggo busways from that date.
Here the Timetable flyers (this link is access to PDF). https://translink.com.au/sites/default/ ... 210419.pdf
https://crossriverrail.qld.gov.au/const ... 5iC13Huxr4
109 stationlink service is to start run between Moorooka and Boggo busways from that date.
Here the Timetable flyers (this link is access to PDF). https://translink.com.au/sites/default/ ... 210419.pdf
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
Re: Yeronga Station Closure.
New timetable is useless not having timing points at each station.
Re: Yeronga Station Closure.
The bus timetable ABS means. I have already sent TransLink that feedback saying it's a pretty big slap in the face making commuters have to guess when their bus will arrive, only judging by the start departure time and a diagrammatic map. I would encourage others to do the same if they have the time.
- superbossgc
- Posts: 2167
- Joined: Thu Apr 20, 2006 2:11 pm
Re: Yeronga Station Closure.
today is 1 week left until closure, yes you can have a photo of those station before late sunday night.
Austral Volvo B10M mk3 Artic (375-380) 1991-2012
Re: Yeronga Station Closure.
The trains are not running express from Park Road to Moorooka. It is only Yeronga Station that is being missed at this point in time but this is likely to change in the future.
Having the 109 service running from Boggo Road to Moorooka from the start means that the timetable does not need to be changed every time a new closure is announced during the CRR construction.