boronia wrote:At Olympic Park, I saw a loaded train go through without stopping. Another trackwork deviation?
lunchbox wrote:My City-Blacktown service was held on the down main at Petersham on 7.10.17 from 1437 to 1456 while trackwork was in progress on the local lines. Delayed nineteen minutes! Is this a record?
boronia wrote:When I came through today, both suburban and the down main lines were occupied by track workers. The Up main appeared to be open, but I didn't see any trains on it. A lot of activity between Mac'town and Flemington.
I was on another A set and yes it was asking passengers to change at Strathfield for T2 Inner West and Leppington (as opposed to T2 South Line)Campbelltown busboy wrote:I was on waratah A01 between Liverpool and Glenfield this afternoon and heard the change at Glenfield for T8 Airport line DVA announcement would it be abit early for Sydney Trains to update the DVA announcements on waratahs
sunnyyan wrote:Noticed in the past week, more and more advertisements are being put up on M sets. I've seen
- exterior ads between the windows
- upper deck ads above the windows
- lower deck ads on the top edge of the windows
Jurassic_Joke wrote:makes me as livid as an environmentalist seeing Woolies wrap fruit+veg in plastic,
Return to Discussion - Sydney / NSW
Users browsing this forum: BusPlaneTrainTram, Engineering and 6 guests