The Gawler, Outer Harbor & Grange lines will face temporary closures for up to 2.5 months to continue works on the Torrens Junction project.

The Gawler line will be closed between Adelaide & Mawson Lakes from Sunday 1st October to Sunday 15th October.
http://www.adelaidemetro.com.au/Announc ... tober-2017

The Outer Harbor & Grange lines will face a much longer closure - they will close a few hours after the SANFL Grand Final on Sunday 24th September until Sunday 3rd December.
http://www.adelaidemetro.com.au/Announc ... ember-2017

Looks like the bulk of the Port line tunnel will be constructed during this closure. Sounds like the last train to ever cross Park Tce at grade will be on Sunday 24th September.
$2,500 fines for vehicles illegally using red Bus Only lanes - could cut the state's debt real quickly if they extended that to regular Bus Lanes!
User avatar
Eagle Eye
 
Posts: 2314
Joined: Fri Jan 02, 2009 1:24 pm
Location: Tunnel
Has thanked: 115 times
Been thanked: 138 times
Favourite Vehicle: High-floor bus

Re: Rail closures for Torrens Junction Project

Postby jibb » Wed Sep 13, 2017 10:01 pm

I would imagine that both Lonsdale and Morphettvilles "R" series Scania Artics will get used on these substitute services.
jibb
 
Posts: 3641
Joined: Thu Mar 11, 2004 8:59 pm
Location: 265
Has thanked: 414 times
Been thanked: 188 times

Re: Rail closures for Torrens Junction Project

Postby TT » Wed Sep 13, 2017 10:41 pm

Torrens have managed to cover all the other recent Outer Hbr/Grange line closures (weekdays and weekends) without using the R series artics. And they now have two extra artics down from Darwin.
TT
 
Posts: 1467
Joined: Sun Mar 07, 2004 10:13 am
Location: Adelaide [West Lakes]
Has thanked: 112 times
Been thanked: 77 times
Favourite Vehicle: Mercedes-Benz 0500-LE

Re: Rail closures for Torrens Junction Project

Postby coach driver 1981 » Thu Sep 14, 2017 12:36 am

TT wrote:Torrens have managed to cover all the other recent Outer Hbr/Grange line closures (weekdays and weekends) without using the R series artics. And they now have two extra artics down from Darwin.

torrens are really good at building rail sub work into shifts compared to other operators who have them as seperate shifts. When did these 2 artics arrive? and what make are they and im guessing they are parked at Mile End
coach driver 1981
 
Posts: 177
Joined: Thu Dec 03, 2015 7:45 pm
Has thanked: 23 times
Been thanked: 17 times

Re: Rail closures for Torrens Junction Project

Postby Diesel_MAN » Thu Sep 14, 2017 1:16 pm

coach driver 1981 wrote:
TT wrote:Torrens have managed to cover all the other recent Outer Hbr/Grange line closures (weekdays and weekends) without using the R series artics. And they now have two extra artics down from Darwin.

torrens are really good at building rail sub work into shifts compared to other operators who have them as seperate shifts. When did these 2 artics arrive? and what make are they and im guessing they are parked at Mile End

They are Volgren-bodied L94UAs according to the 'To Be Delivered' page in the Fleet Lists.
Please leave via centre door.
Please push handle to open door.
Diesel_MAN
 
Posts: 425
Joined: Thu Jun 05, 2014 1:13 pm
Location: Possibly on a bus.
Has thanked: 134 times
Been thanked: 26 times
Favourite Vehicle: PMC Buses

Re: Rail closures for Torrens Junction Project

Postby jibb » Thu Sep 14, 2017 2:21 pm

They are certainly going to need extra buses once the school holidays are over,as currently they don't have enough spares.
jibb
 
Posts: 3641
Joined: Thu Mar 11, 2004 8:59 pm
Location: 265
Has thanked: 414 times
Been thanked: 188 times

Re: Rail closures for Torrens Junction Project

Postby jibb » Tue Nov 14, 2017 11:13 am

DPTI/Adelaide Metro have announced following Rail closures;-
Gawler Line
Closed from 900pm Saturday 18th November and reopens Tuesday 5th December between Adelaide and Mawson Lakes
Free substitute buses will operate.

Outer Harbour-Grange lines
Closure will now be extended until 2018.Normal services will now resume on 15th January 2018
jibb
 
Posts: 3641
Joined: Thu Mar 11, 2004 8:59 pm
Location: 265
Has thanked: 414 times
Been thanked: 188 times

Re: Rail closures for Torrens Junction Project

Postby I Follow PAFC » Tue Nov 14, 2017 11:43 am

jibb wrote:DPTI/Adelaide Metro have announced following Rail closures;-

Outer Harbour-Grange lines
Closure will now be extended until 2018.Normal services will now resume on 15th January 2018


:evil: :evil:
I Follow PAFC
 
Posts: 98
Joined: Fri May 30, 2014 5:13 pm
Has thanked: 7 times
Been thanked: 15 times
Favourite Vehicle: Any low floor bus

Re: Rail closures for Torrens Junction Project

Postby coach driver 1981 » Tue Nov 14, 2017 11:51 pm

geez talk about giving commuters plenty of notice to plan alternatives must also be a nightmare for Southlink to find drivers and shift cutting for the Gawler line closure
coach driver 1981
 
Posts: 177
Joined: Thu Dec 03, 2015 7:45 pm
Has thanked: 23 times
Been thanked: 17 times

Re: Rail closures for Torrens Junction Project

Postby I Follow PAFC » Sat Jan 13, 2018 12:01 am

UPDATE : Outer Harbor and Grange rail line reopening Monday 15 January 2018.

The Outer Harbor and Grange rail lines will reopen on Monday 15 January 2018 with the substitute buses finishing from last service Sunday 14 January 2018.
Outer Harbor and Grange train services will remain FREE until Sunday 28 January 2018.
Passengers are advised to please enter and exit the Adelaide Railway Station via the northern barrier gates 20-25 (closest to the Adelaide Metro InfoCentre).

https://www.adelaidemetro.com.au/Announ ... nuary-2018
I Follow PAFC
 
Posts: 98
Joined: Fri May 30, 2014 5:13 pm
Has thanked: 7 times
Been thanked: 15 times
Favourite Vehicle: Any low floor bus



  • Advertisement

Return to Discussion - Adelaide / SA

Who is online

Users browsing this forum: No registered users and 4 guests

cron