This plan has been finalised.
Only major changes on the PT side of things:
- East Wanneroo Link Stage 3 - Ellenbrook spur brought forward to be required by 3.5 million
- Perth Orbital extended from Morley to Bayswater to form a complete orbit around the central metropolitan area
- Perth Orbital section between Forrestfield and Thornlie brought forward to be required by 3.5 million
- Future inner-city subway area expanded to include Curtin, South Perth and QEII/UWA.
[Perth] Transport @ 3.5 million people
Moderators: perthbus, Mr OC Benz
-
- Moderator
- Posts: 5810
- Joined: Sat Jun 06, 2009 12:18 pm
- Favourite Vehicle: Anything German
- Location: Sydney, NSW
Re: [Perth] Transport @ 3.5 million people
Glad they extended the orbital to Bayswater. That was the very first thing I noticed when I looked at it!Mr OC Benz wrote:This plan has been finalised.
Only major changes on the PT side of things:
- East Wanneroo Link Stage 3 - Ellenbrook spur brought forward to be required by 3.5 million
- Perth Orbital extended from Morley to Bayswater to form a complete orbit around the central metropolitan area
- Perth Orbital section between Forrestfield and Thornlie brought forward to be required by 3.5 million
- Future inner-city subway area expanded to include Curtin, South Perth and QEII/UWA.